检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨国富 王长明 汪敏 Yang Guo-fu;Wang Chang-ming;Wang Min
机构地区:[1]中建二局第三建筑工程有限公司,北京100070
出 处:《建筑技术开发》2024年第12期50-52,共3页Building Technology Development
摘 要:本研究主要介绍正定安济路管廊项目中安济路与新城大街交叉口西侧管廊主体结构紧邻运行中的地铁车站,为保障施工期间不会给地铁车站的正常安全运行带来干扰,采用先进的钢支撑支护开挖施工技术、完善的监测体系,建立高效的协调机制,确保施工过程中安全、高效平稳运行,为类似的工程提供相关借鉴经验。This article mainly introduces that in the Zhengding Anji Road Utility Tunnel Project,the utility tunnel main structure at the west side of the intersection of Anji Road and Xincheng Street is close to the operating subway.In order to ensure that the deep foundation pit excavation and the main structure construction will not affect the safe operation of the subway station,advanced steel support and excavation construction technology,a perfect monitoring system,and an efficient coordination mechanism are adopted to ensure the safe and efficient smooth operation during the construction process,and provide reference experience for similar projects.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7