检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王北 WANG Bei(Sinohydro Bureau 5 Co.,Ltd.,Chengdu Sichuan 610066)
机构地区:[1]中国水利水电第五工程局有限公司,四川成都610066
出 处:《四川水力发电》2024年第S02期58-61,共4页Sichuan Hydropower
摘 要:近年来,随着国家对基础公共设施的投入力度逐渐扩大,铁路与公路建设的工程项目与日俱增。而因施工单位较国家投入前所承担项目的增多,在人才储备及施工细节方面未做到明确规划而导致施工过程中存在的质量问题较多。分析了铁路转体连续梁承台施工常见的质量问题,以及针对铁路转体连续梁承台施工质量问题采取的有效应对措施。In recent years,the China's investment in basic public facilities has gradually expanded,resulting in an increasing number of railway and highway construction projects.However,due to the increasing number of projects undertaken by construction units compared to before the national investment,there has been a lack of clear planning in terms of talent reserves and construction details,resulting in more quality problems during the construction process.This paper analyzes the common quality problems in the construction of railway rotating continuous beam bearing platform,and provides effective countermeasures to address the quality issues in railway rotating continuous beam bearing platform construction.
分 类 号:U215[交通运输工程—道路与铁道工程] U215.1U215.7
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7