检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:严寒 Yan Han(Powerchina Northwest Engineering Co.,Ltd.,Xi’an,710065)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065
出 处:《建设科技》2024年第21期62-65,共4页Construction Science and Technology
摘 要:目前国内外水电建设项目大量涌现,为了维持水电站厂房内发电设备可靠运行和满足工作人员对热湿环境、空气质量和事故疏散的要求,需要合理设置供暖、通风、空调和防排烟系统。通过梳理国内外水电站厂房暖通专业的设计阶段、设计依据、计算书编写、通风空调系统、防排烟系统等方面的差异,积累经验,为相关设计人员提供参考。At present,there are a large number of hydropower construction projects at home and abroad.In order to both maintain the reliable operation of hydropower plant generation equipment and meet the requirements of worker for thermal environment,air quality and accident evacuation,it is necessary to reasonably set up heating,ventilation,air conditioning and smoke control systems.This paper combs the differences in the design stage,design basis,calculation booklet preparation,ventilation and air conditioning system,smoke control system and other aspects of HVAC profession of hydropower plant at home and abroad,so as to accumulate the experience to relevant designers for reference.
关 键 词:水电站厂房 暖通 国内外 ASHRAE NFPA
分 类 号:TV73[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.36.242