检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈伟桢 CHEN Wei-zhen(China Railway Construction Group Southern Engineering Co.Ltd.,Guangzhou 510000,China)
机构地区:[1]中铁建设集团南方工程有限公司,广州510000
出 处:《工程建设与设计》2024年第22期127-129,共3页Construction & Design for Engineering
摘 要:对澳氹第四条跨海大桥单柱墩盖梁抱箍法施工工艺流程及施工方法进行阐述与总结,并针对抱箍托架法面临大悬挑及托架下沉问题,利用CAD画图软件设计优化抱箍托架图,利用Midas Civil建立模型进行受力分析,得出各方面受力均满足要求。This article elaborates and summarizes the construction process and method of the single column pier cap beam and hoop method for the fourth cross sea bridge in Aodang. And for the problem of large overhang and bracket sinking faced by the hoop bracket method, CAD drawing software was used to design and optimize the hoop bracket diagram. A model was established by using Midas Civil for force analysis, and it was found that all aspects of the force met the requirements.
分 类 号:U445.46[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.67.245