检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡凯涛 HU Kai-tao(CCCC Fourth Harbor Second Engineering Co.Ltd.,Guangzhou 510200,China)
机构地区:[1]中交四航局第二工程有限公司,广州510200
出 处:《工程建设与设计》2024年第22期145-147,共3页Construction & Design for Engineering
摘 要:以印度尼西亚爪哇某工业园区的建设施工为例,对深厚软弱淤泥质土条件下采用真空预压法进行地基加固施工时,静力触探与砂沟开挖、排水板打设、水平排水管安装与砂沟回填、土工布铺设、真空膜铺设与密封沟开挖以及真空预压系统安装和真空运行过程中的施工要点进行分析。Taking the construction of an industrial park in Java, Indonesia as an example, the construction points of static penetration and sand trench excavation, drainage plate construction, horizontal drainage pipe installation and sand trench backfilling, geotextile laying,vacuum film laying and sealing trench excavation, as well as vacuum precompression system installation and vacuum operation in the construction of foundation reinforcement with vacuum precompression method under the condition of deep and weak silt soil are discussed.
分 类 号:TU753.8[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7