检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁伟 YUAN Wei(Shenzhen Zhongguang Foundation Engineering Co.Ltd.,Shenzhen 518000,China)
机构地区:[1]深圳市中广基础工程有限公司,广东深圳518000
出 处:《工程建设与设计》2024年第22期217-219,共3页Construction & Design for Engineering
摘 要:某工程塔楼桩基础施工时,为使桩基承载力满足设计要求,试验采用桩后注浆施工技术。论文介绍了该项目桩基的设计概况、后注浆施工设计及施工流程、注浆管路布置与安装、后注浆浆液配置等内容,并对施工质量进行检查验收。During the construction of tower pile foundation of a project, in order to make the bearing capacity of pile foundation meet the design requirements, the post-pile grouting construction technology is used in the test. This paper introduces the general situation of pile foundation design, post-grouting construction design and construction process, grouting pipeline layout and installation, post-grouting slurry configuration and so on, and checks and accepts the construction quality.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.237.222