检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵赫 ZHAO He(School of Economics and Management,Northeast Electric Power University,Jilin 132000,China)
机构地区:[1]东北电力大学经济管理学院,吉林吉林132000
出 处:《工程建设与设计》2024年第22期244-246,共3页Construction & Design for Engineering
摘 要:高速公路建设工程进度管理存在诸多问题,引入关键链技术进行工程进度管理优化提升十分必要,关键链识别是关键链技术应用的首要环节。论文主要研究建立一种关键识别模型,对初始关键链从后向前进行工序整合,调整资源冲突,确定最终关键链,并通过某高速公路工程进度管理进行实例分析,证明其可行性和有效性。There are many problems in the progress management of expressway construction project, so it is necessary to introduce the key chain technology to optimize and improve the project progress management, and the key chain identification is the primary link in the application of key chain technology. This paper mainly studies the establishment of a key identification model, integrates the process of the initial key chain from the back to the front, adjusts resource conflicts, determines the final critical chain, and proves its feasibility and effectiveness through an example of the progress management of a highway project.
分 类 号:U415.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.239