检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵俊 邵宾 韩流[2] 丛酩轩 ZHAO Jun;SHAO Bin;HAN Liu;CONG Mingxuan(China Coal Pingshuo Group Co.,Ltd.,Shuozhou 036000,China;School of Mines,China University of Mining&Technology,Xuzhou 221116,China)
机构地区:[1]中煤平朔集团有限公司,山西朔州036000 [2]中国矿业大学矿业工程学院,江苏徐州221116
出 处:《露天采矿技术》2024年第6期44-48,共5页Opencast Mining Technology
基 金:国家自然科学基金面上资助项目(52374144);新疆维吾尔自治区重大科技专项资助项目(2023A01002);辽宁省自然科学基金-国家重点实验室联合开放基金资助项目(2022-KF-23-10)。
摘 要:为分析平朔东露天煤矿端帮采煤区边坡稳定性,以DB-01、DB-02、DB-03等3个典型边坡剖面为研究对象,选取了合理的边坡稳定性安全储备系数与岩土体物理力学参数,基于极限平衡与有限先强度折减原理进行边坡稳定性分析,确定了各边坡开采到界的稳定系数均满足安全系数规范要求,并提出了端帮采煤区边坡监测治理措施。结果表明:平朔东露天煤矿端帮到界后的稳定系数均在1.2以上,到界端帮处于稳定状态,可进一步实施端帮采煤机开采;确定的4#煤的采硐高度为5 m、宽度为3.3 m,煤柱宽度为5 m;确定的9^(#)煤的采硐高度为5 m、宽度为3.3 m,煤柱宽度为6 m;端帮采煤机开采区的稳定性达到1.1以上,满足安全储备要求。In order to analyze the slope stability in the end slope mining area of Pingshuo East Open-pit Coal Mine,the article selectes three typical slope profiles,DB-01,DB-02 and DB-03 as the research objects,and selectes the reasonable slope stability safety reserve coefficients and physical and mechanical parameters of the rock and soil.Based on the principles of limit equilibrium and finite initial strength reduction,we conduct slope stability analysis and determine that the stability coefficients of each slope at the mining boundary meet the safety factor specification requirements and present the measures for monitoring and controlling the slopes of the end slope coal mining area.The results show that the stability coefficients of the end slope of Pingshuo East Open-pit Coal Mine are all above 1.2 after reaching the boundary,and the end slope is in a stable state,which can be further implemented by the end face coal mining machine.The article determines that the height and width of the mining tunnel for coal seam 4 are 5 m and 3.3 m,and the width of the coal pillar is 5 m,and the height and width of the mining tunnel for 9 coal seams are 5 m and 3.3 m,with a coal pillar width of 6 m.The stability of the mining area of the end slope shearer reaches 1.1 or above,meeting the safety reserve requirements.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.73.229