检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李延泽 LI Yanze(Antaibao Open-pit Mine,China Coal Pingshuo Group Co.,Ltd.,Shuozhou 036000,China)
机构地区:[1]中煤平朔集团有限公司安太堡露天矿,山西朔州036000
出 处:《露天采矿技术》2024年第6期74-79,共6页Opencast Mining Technology
摘 要:为了降低安太堡露天矿外排土场的用地面积,研究了在背斜构造条件下,内排土场扩容的可行性;根据对排土现状的分析,提出了2套内排排土扩容方案;基于最新修正的安太堡露天矿三维地质模型、地表现状航测成果和排土方案设计,构建了边坡工程地质模型;采用极限平衡法中Spencer和M-P法对两套方案的内排土场扩容后的边坡稳定性进行了安全评价分析。结果表明:内排土场扩容方案1更有利于安太堡露天矿安全生产建设。To reduce the land area occupied by the external dump of Antaibao Open-pit Mine,the article studies the feasibility of expanding the internal dump under the conditions of anticline structures,proposes two sets of expansion plans for internal dumping based on the analysis of the current inner dumping situation.We construct a geological model of slope engineering based on the latest revised three-dimensional geological model of Antaibao Open-pit Mine,surface condition aerial survey results,and dumping plan design,evaluates the stability of the slopes after the expansion of the internal dump under the two plans for safety using the Spencer and M-P methods of limit equilibrium analysis.The results indicate that expansion plan 1 for the internal dump is more conducive to the safe production and construction of Antaibao Open-pit Mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.162.18