检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石同瑶 黄庆桥 Shi Tongyao;Huang Qingqiao(School of Marxism,Shanghai Jiao Tong University,Shanghai 200240,China)
机构地区:[1]上海交通大学马克思主义学院,上海200240
出 处:《中国科技论坛》2024年第12期108-116,共9页Forum on Science and Technology in China
基 金:国家社会科学基金一般项目“中国共产党领导重大科技工程的决策机制与管理模式研究”(20BDJ089)。
摘 要:反应堆技术路线的确立是核电站总体设计的第一步,对国家核电事业的发展具有极其重要的战略性意义。秦山核电站作为中国首座自主建设的核电站,其技术路线的早期探索深刻反映出中国核电站反应堆技术路线的变迁和实践历程。伴随着秦山核电站的筹划和设计,中国核电站反应堆技术路线发生了数次转变。第一阶段是1964-1966年,初步确定“孪生式反应堆”路线;第二阶段是1966-1970年,建设意向先转为“实验性核动力反应堆”,后又转为“天然铀石墨气冷堆”和“高温气冷堆”;第三阶段是1970-1974年,技术路线经历了“熔盐堆”与“压水堆”之争。中国核电站反应堆技术路线早期探索的历史经验,至今仍具有现实启发意义。The establishment of the reactor technical route is the first step in the overall design of the nuclear power plant,which has important strategic significance for the development of the national nuclear power industry.As the first self-built nuclear power plant in China,the early exploration of the technical route of Qinshan Nuclear Power Plant deeply reflects the changes and practice of the reactor technical route for nuclear power plant in China.With the construction of Qinshan Nuclear Power Plant,the reactor technical route for nuclear power plant in China has undergone several changes.The first stage was 1964-1966,when the“twin reactor”route was initially determined.The second stage was 1966-1970,the construction goal first changed to“experimental nuclear power reactor”,and then to“natural uranium graphite gas cooled reactor”and“high temperature gas cooled reactor”.The third stage was 1970-1974,the technical route experienced the controversy between“molten salt reactor”and“pressurized water reactor”.Looking back on the historical experiences of the early exploration of the reactor technical route for nuclear power plant in China,it is still of practical significance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.233.20