检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲁晓通 赖忠辉 张肖锋 Lu Xiao-tong;Lai Zhong-hui;Zhang Xiao-feng(China Construction Science&Technology Group Co.,Ltd.,Shenzhen 518118,Guangdong Province,China)
出 处:《建筑与装饰》2024年第23期172-174,共3页Construction & Decoration
摘 要:坪山新能源汽车产业园区1-3栋项目采用钢框架结构+预应力空心板+预制外墙+预制楼梯的设计结构,各栋塔楼主体结构层高高、跨度大、荷载重,项目团队及公司技术团队成立专项课题研究小组,通过以往的施工经验以及装配式思维,从施工的角度研究提高大跨度空心楼板的施工效率,压缩整层楼板的整体施工时间、提高空心板施工的工艺质量水平。Buildings 1-3 project in Pingshan New Energy Automobile Industrial Park adopts the design structure of steel frame structure+prestressed hollow slab+prefabricated exterior wall+prefabricated staircase,the main structure of each tower building has high story height,large span and heavy load,the project team and the company's technical team set up a special research team.Based on previous construction experience and prefabricated thinking,from the perspective of construction,the construction efficiency of large-span hollow floor is improved,the overall construction time of the whole floor is compressed,and the process quality level of hollow slab construction is improved.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.173.223