检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石强 金振涛 王恒 SHI Qiang;JIN Zhen-tao;WANG Heng(Central&Southern China Municipal Engineering Design and Research Institute Co Ltd,Wuhan 430014,China)
机构地区:[1]中国市政工程中南设计研究总院有限公司,武汉430014
出 处:《建材世界》2024年第6期93-96,共4页The World of Building Materials
摘 要:对嵌岩灌注桩深基坑分别采用理正深基坑软件中的单元计算模块和整体计算模块进行计算分析,结果表明:整体建模计算能充分考虑灌注桩、冠梁、腰梁的整体受力及空间协调性,灌注桩桩长和配筋均可减小。同时,对不同冠梁刚度、腰梁刚度的模型进行整体建模计算分析。结果表明,增大冠梁刚度可以减小桩顶位移,不能减小最大位移;增大腰梁刚度可以减小最大位移,不能减小桩顶位移。The unit calculation module and the whole calculation module in Lizheng deep foundation pit software were used to calculate and analyze the deep foundation pit of rock-socketed piles respectively.The results show that the whole force and spatial coordination of the pile,crown beam and waist beam can be fully considered in the whole modeling calculation,and the pile length and reinforcement can be reduced.At the same time,the whole model of different crown beam stiffness and waist beam stiffness was calculated and analyzed.The results show that increasing crown beam stiffness can reduce pile top displacement,but not the maximum displacement,and increasing waist beam stiffness can reduce the maximum displacement,but not the pile top displacement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13