检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:颜肖健 YAN Xiao-jian(Shaoxing Kezhu Expressway Co.,Ltd.,Shaoxing,Zhejiang,312000,China)
机构地区:[1]绍兴市柯诸高速公路有限公司,浙江绍兴312000
出 处:《建材技术与应用》2024年第6期42-46,共5页Research and Application of Building Materials
摘 要:通过对台阶法、CRD法和双侧壁导坑法在隧道施工过程中对围岩应力和变形的影响进行数值模拟和数据分析,研究发现:台阶法初期扰动小,但后期应力集中变形增大;CRD法因逐段开挖初期隆起沉降大,应力集中不均匀;双侧壁导坑法初期变形控制好,后期变形增加。In this paper,the numerical simulation and data analysis of the influence of step method,CRD method and double sidewall guided pit method on the stress and deformation of surrounding rock during tunnel construction are carried out.The results show that the disturbance of step method is small in the initial stage,but the stress concentration deformation increases in the later stage.CRD method has large uplift settlement and uneven stress concentration in the early stage of excavation.The deformation of double sidewall guided pit method is controlled well in the early stage,and the deformation increases in the later stage.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229