基于AHP-模糊的市政综合管廊项目应用BIM风险评价  

Risk Assessment of BIM in Municipal Comprehensive Pipe Gallery Project Based on AHP-Fuzzy

在线阅读下载全文

作  者:杨峰 YANG Feng(Fujian Forestry Vocational&Technical College,Nanping,Fujian,353000,China)

机构地区:[1]福建林业职业技术学院,福建南平353000

出  处:《建材技术与应用》2024年第6期63-67,共5页Research and Application of Building Materials

摘  要:在综合管廊项目中应用BIM技术面临着较多风险。基于层次分析法,构建了风险因素指标体系并计算相关权重,识别出综合管廊中BIM应用的主要风险因素。通过模糊综合评价法对案例进行风险评估,找出BIM在综合管廊项目中应用的风险,并提出相应的风险降低建议。The application of BIM technology in comprehensive pipe gallery project faces many risks.Based on the analytic hierarchy process(AHP),the risk factor index system was constructed and the relevant weights were calculated,and the main risk factors for BIM application in the integrated pipe gallery were identified.The risk assessment of the case was carried out through the fuzzy comprehensive evaluation method,the risk of BIM application in the integrated pipe corridor project was found out,and the corresponding risk reduction suggestions were put forward.

关 键 词:BIM应用 综合管廊 项目风险 风险评价 

分 类 号:TU990.3[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象