检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周晓泷 普贞全 邬勇 ZHOU Xiaolong;PU Zhenquan;WU Yong(China Water Resources and Hydropower Construction Engineering Consulting Kunming Co.,LTD.,Kunming Yunnan 650000;Power China Kunming Survey,Design and Research Institute,Kunming Yunnan 650000)
机构地区:[1]中国水利水电建设工程咨询昆明有限公司,云南昆明650000 [2]中国电建集团昆明勘测设计研究院有限公司,云南昆明650000
出 处:《中国科技纵横》2024年第19期100-102,共3页China Science & Technology Overview
摘 要:优化施工监理工作、完善施工监理的控制是建筑深基坑工程施工的重点。因此,本文深入研究建筑深基坑工程的施工监理控制要点,全面介绍目前建筑深基坑工程施工监理控制的现状,发现并解决监理工作中存在的不足和问题。针对这些问题,本文通过制定相对应的处理方案,规范施工监理的细节与内容,升级施工监理的平台与系统,达成施工监理和信息化技术的全面融合。此举旨在打破在施工技术和制度上的限制,充分发挥施工监理工作的优势和特点,确保在规定时间内完成施工任务。Optimizing the construction supervision work and improving the control of construction supervision have become the focus of the construction of deep foundation pit construction.Therefore,the in-depth study of the key points of construction supervision and control of building deep foundation pit engineering is helpful to fully understand the current status of construction supervision and control of building deep foundation pit engineering,and to find and solve the deficiencies and problems in the supervision work.In view of these problems,corresponding treatment plans should be formulated to standardize the details and content of construction supervision,upgrade the platform and system of construction supervision,achieve the comprehensive integration of construction supervision and information technology,and create a more efficient engineering construction environment.This move aims to break the restrictions on construction technology and system,give full play to the advantages and characteristics of construction supervision,ensure that the construction task is completed within the specified time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195