检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:丁东强 Ding Dongqiang(Shanghai Foundation Engineering Group Co.,Ltd.,Shanghai 200433,China)
机构地区:[1]上海市基础工程集团有限公司,上海200433
出 处:《山西建筑》2025年第2期107-111,共5页Shanxi Architecture
摘 要:顶管施工测量是顶管施工技术中重要的组成部分,其目的是实时测量顶管机的空间位置,指导顶管机沿设计轴线开挖,直至顺利贯通。以上海某污水排管工程为背景,结合项目大直径、长距离曲线顶管的特点,从地面控制测量、顶管施工导墙测量等方面阐述了顶管施工测量关键技术,验证了该技术的可行性,保证了顶管施工质量。Pipe jacking construction measurement is an important component of pipe jacking construction technology,which aims to measure the spatial position of the top pipe machine in real-time,guide the excavation of the top pipe machine along the design axis,and ensure smooth penetration.Taking a a sewage discharge pipeproject in Shanghai as the background,combing with the characteristics of large-diameter and long-distance curved pipe jacking of the project,the paper introduces critical pipe jacking measurement techniques from aspects of ground control survey,pipe jacking construction and guidance survey,testifies its feasibility and guarantees the pipe jacking construction quality as well.
分 类 号:TU745[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33