检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222
出 处:《科技创新与应用》2024年第35期103-106,112,共5页Technology Innovation and Application
摘 要:随着光伏组件、逆变器技术的发展,集中式光伏电站装机容量越来越大,选择合适的电气主接线可以提高发电量,降低初始投资和运行成本。该文针对光伏基地接入500 kV电网,对比分析35 kV/500 kV一级升压集电线路和变压器组合3个接线方案,500 kV侧3个接线方案,110 kV和220 kV两级升压2个方案,提出制约因素。经过比较,500 kV升压站集电线路和变压器组合采用升压变压器带2段35 kV单母线的单元接线方案,500 kV侧采用双母线接线方案。With the development of photovoltaic modules and inverter technologies,the installed capacity of centralized photovoltaic power stations is becoming larger and larger.Choosing appropriate main electrical wiring can increase power generation capacity and reduce initial investment and operating costs.In this paper,for the photovoltaic base to be connected to the 500 kV power grid,three wiring schemes for the 35 kV/500 kV first-stage step-up collector line and transformer combination and three wiring schemes for the 500 kV side,and two plans for the 110 kV and 220 kV two-stage step-up are compared and analyzed,and restrictive factors are proposed.By comparison,the 500 kV booster station collector line and transformer combination adopts a unit wiring scheme with a booster transformer with two sections of 35 kV single bus,and the 500 kV side adopts a double bus wiring scheme.
关 键 词:光伏电站 电气主接线 500 kV升压站 一级升压 两级升压 双母线接线
分 类 号:TM615[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.172.7