大型综合体超长地下室混凝土结构施工技术探析  

Construction Technology of Super Long Basement Concrete Structure in Large Complex

在线阅读下载全文

作  者:范明勇 Fan Mingyong(Beijing ShouhuaConstruction Management Co.Ltd.,Beijing 100000)

机构地区:[1]北京首华建设经营有限公司,北京100000

出  处:《江西建材》2024年第7期248-250,共3页

摘  要:为探析超长地下室混凝土施工技术,文中以北京某大型综合体项目为例,通过数值分析方法,对比分析跳仓法和后浇带法两种施工方案在浇筑后20、365 d时对结构应力的影响,验证将后浇带法变更为跳仓法的施工可行性。施工过程中,通过优化混凝土配合比、实施有效施工及养护措施、进行严格的温度监控,有效控制了地下室混凝土裂缝的产生。In order to explore the construction technology of ultra-long basement concrete,this paper takes a large and large-scale complex project in Beijing as an example,and compares the influence of bin hopping method and post-cast belt method on structural stress at 20 and 365 days after pouring by numerical analysis method.Verify the construction feasibility of changing the post-cast belt method to skip bin method;Through optimizing concrete mix ratio,implementing effective construction and maintenance measures,and strict temperature monitoring,the generation of concrete cracks in the basement is effectively controlled.

关 键 词:后浇带 抗裂性能 大型综合体 地下室 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象