作 者:梁红玉 Liang Hongyu(Sichuan Railway Construction Co.Ltd.,Chengdu,Sichuan 610000)
机构地区:[1]四川省铁路建设有限公司,四川成都610000
出 处:《江西建材》2024年第7期276-278,共3页
摘 要:为提升软土地区桩网结构路基的力学性能,文中开展了高铁路基桩网结构土工格栅张拉试验,分析路基填筑、桩间防水工况下格栅拉力的分布规律。结果表明,随着放水时间的增加,桩间土的沉降量表现为近似线性增加的变化规律,最终的桩间土沉降量达到了80 mm;桩顶条带桩中心位置处的格栅拉力随着桩间土沉降量的增加表现为不断增加的规律;桩帽边缘的格栅拉力随着桩间土沉降量的增加表现为先增加再降低后稳定的规律。In order to improve the mechanical properties of pile mesh structure roadbed in soft soil area,the paper carried out the tensile test of pile mesh structure of high railway foundation,and analyzed the distribution law of grid tension under subgrade filling and waterproofing between piles.The results show that with the increase of water discharge time,the settlement of soil between piles increases approximately linearly,and the final settlement of soil between piles reaches 80 mm.The grille pull at the center of strip pile at the top of pile increases with the increase of soil settlement between piles.With the increase of soil settlement between piles,the grid tension at the edge of pile cap increases first,then decreases and then becomes stable.
分 类 号:U24[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.152.135