湿陷性黄土地区明挖车行地道设计分析  

Design and Analysis of Driving Tunnel Excavated in Collapsible Loess Area

在线阅读下载全文

作  者:李敏 LI Min

机构地区:[1]上海林同炎李国豪土建工程咨询有限公司,上海市200437

出  处:《城市道桥与防洪》2024年第11期59-61,M0007,M0008,共5页Urban Roads Bridges & Flood Control

摘  要:测定湿陷系数的试验压力按规范计算远大于实际压力,规范偏保守。对黄土浸水湿陷这一偶然设计状况,通过偶然组合与基本组合、标准组合进行对比计算分析可知,黄土浸水湿陷工况非受控工况。通过减少水源补给、隔绝水及将水排出地道影响范围,可以有效减少湿陷沉降的发生。The test pressure for determining the coefficient of collapsibility is much greater than the actual pressure according to the specification. The norm is partially conservative. For the accidental design condition of loess immersion and collapsibility, the results of comparison, calculation and analysis through the accidental composition, basic combination and standard combination show that the loess immersed and collapsible condition is uncontrolled condition. By reducing the water supply, isolating the water and discharging the water out of the influence area of the tunnel, the occurrence of collapse settlement can be effectively reduced.

关 键 词:湿陷性黄土 超固结土 湿陷系数试验压力 

分 类 号:U452[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象