检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:WANG Qiang WANG Yufeng HU Yongquan ZHAO Jinzhou SONG Yi SHEN Cheng
机构地区:[1]State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation,Southwest Petroleum University,Chengdu 610500,China [2]Shale Gas Research Institute,PetroChina Southwest Oil&Gas Field Company,Chengdu 610051,China
出 处:《Petroleum Exploration and Development》2024年第5期1316-1326,共11页石油勘探与开发(英文版)
基 金:Supported by National Natural Science Foundation Joint Fund Project(NO.U21B2071);National Natural Science Youth Foundation of China(NO.52304041)。
摘 要:In response to the unclear understanding of fracture propagation and intersection interference in zipper fracturing under the factory development model of deep shale gas wells,a coupled hydro-mechanical model for zipper fracturing considering the influence of natural fracture zones was established based on the finite element–discrete element method.The reliability of the model was verified using experimental data and field monitoring pressure increase data.Taking the deep shale gas reservoir in southern Sichuan as an example,the propagation and interference laws of fracturing fractures under the influence of natural fracture zones with different characteristics were studied.The results show that the large approaching angle fracture zone has a blocking effect on the forward propagation of fracturing fractures and the intersection of inter well fractures.During pump shutdown,hydraulic fractures exhibit continued expansion behavior under net pressure driving.Under high stress difference,as the approaching angle of the fracture zone increases,the response well pressure increase and the total length of the fractured fracture show a trend of first decreasing and then increasing,and first increasing and then decreasing,respectively.Compared to small approach angle fracture zones,natural fracture zones with large approach angles require longer time and have greater difficulty to intersect.The width of fractures and the length of natural fractures are negatively and positively correlated with the response well pressure increase,respectively,and positively and negatively correlated with the time required for intersection,the total length of hydraulic fractures,and fracturing efficiency,respectively.As the displacement distance of the well increases,the probability of fracture intersection decreases,but the regularity between displacement distance and the response well pressure increase and the total length of fractures is not obvious.
关 键 词:thin sand-mud interbedded reservoir fracture penetration fracturing simulation experiment numerical simulation fracture penetration discrimination criterion fracturing performance evaluation
分 类 号:TE377[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38