检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:厍挺 SHE Ting(Gansu Installation and Construction Group Co.,Ltd.,Lanzhou,Gansu 730050,China)
机构地区:[1]甘肃省安装建设集团有限公司,甘肃兰州730050
出 处:《有色金属设计》2024年第4期92-95,共4页Nonferrous Metals Design
摘 要:为解决电网能效与稳定性问题,以中核克拉玛依源网荷储一体化项目的220 kV汇集站为例,从汇集站的总体概况、详细设计方案、保护与控制系统设计,到能效优化技术等多个方面进行了深入分析,提出综合性的设计方案和能效优化措施,为提升电网的接纳能力和电能质量提供有效策略和解决方案。To improve energy efficiency and stability of power grid,this paper takes the 220 kV collection station of the CNNC Karamay Source-Grid-Load-Storage Integration Project for case study.It conducts an in-depth analysis from various aspects,including the overall situation of the collection station,detailed design scheme,protection and control system design,and energy efficiency optimization technology,and proposes comprehensive design solutions and energy efficiency optimization measures,providing effective strategies and solutions for enhancing the grid’s acceptance capacity and power quality.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7