检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:缪昌文 MIAO Changwen(Gansu Wuhuan Highway Engineering Co.,Ltd.,Lanzhou,Gansu Province,730000 China)
机构地区:[1]甘肃五环公路工程有限公司,甘肃兰州730000
出 处:《科技资讯》2024年第22期174-176,共3页Science & Technology Information
摘 要:随着社会经济的不断发展和交通网络的不断完善,公路桥梁的建设已成为城市发展的重要标志之一。为保证道路桥梁工程整体稳定性,须确保工程高墩的施工质量,以实际工程为例,探讨道路桥梁工程高墩施工技术。结合工程实际情况,选择翻模施工技术进行高墩施工,并按照施工标准完成关键工序施工。采用全站仪对施工结果进行检验,测量墩身边线垂直度,高墩垂直度结果最大值为16.6 mm,满足施工标准。With the continuous development of social economy and the continuous improvement of traffic net⁃work,the construction of highway bridge has become one of the important symbols of urban development.In or⁃der to ensure the overall stability of road and bridge engineering,it is necessary to ensure the construction quality of engineering high pier.Taking actual engineering as an example,this paper explores the construction technology of high piers in road and bridge engineering.According to the actual situation of the project,formwork-turnover con⁃struction technology is selected for high pier construction,and the key process construction is completed according to the construction standard.The total station is used to test the construction results,and the maximum value of the verticality of the side line of the pier is 16.6mm,which meets the construction standard.
关 键 词:道路桥梁工程 高墩施工技术 翻模施工 空心墩模板
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.17.164