检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马国金 梁淑贞 郭秀艳 MA Guojin;LIANG Shuzhen;GUO Xiuyan(School of Architectural Engineering,Jinggangshan University,Ji’an,Jiangxi 343009,China;School of Materials Science and Engineering,Jiangxi University of Science and Technology,Ganzhou,Jiangxi 3410999,China;School of Mechanical&Electrical Engineering,Jinggangshan University,Ji’an,Jiangxi 343009,China)
机构地区:[1]井冈山大学建筑工程学院,江西吉安343009 [2]江西理工大学材料科学与工程学院,江西赣州341099 [3]井冈山大学机电工程学院,江西吉安343009
出 处:《井冈山大学学报(自然科学版)》2024年第6期102-108,共7页Journal of Jinggangshan University (Natural Science)
基 金:江西省教育厅科技计划项目(GJJ211038)。
摘 要:转盘是修井钻塞施工中用来驱动钻具转动,用于实现倒扣、套铣和磨铣等工作的设备,为了获得优质的转盘铸件,其铸造工艺设计就显得尤其重要。本研究以上转盘本体构件为例,基于Pro CAST软件对其凝固工艺进行优化设计。上转盘材料为HT300,净重502 kg,属于中型盘类铸件。结合铸件的结构特点及分型面选取,提出环绕平浇式和底注立浇式两种铸造工艺方案,并对金属液充型速度场、铸件缺陷等进行了模拟分析和优化。实验结果表明:底面立式浇注方案可以在40.39 s完成整个铸件的充型过程;未开设冒口时,在铸件孔周边存在较多的缩孔、缩松缺陷,通过开设冒口和增设冷铁可以明显改善这一现象;二次优化后,充型时间缩短至29.30 s,实现了由糊状凝固到顺序凝固的温度场转变,得到了最佳的铸造工艺。The turntable is used to drive the drilling tool rotation in the workover and plug drilling,which is suitable for realizing reverse and casing milling.The foundry process design is more and more important in the casting quality for obtaining a quality turntable.This article takes an upper turntable body as an example,the optimization of solidification technology is analyzed based on Pro CAST.The upper turntable body made from HT300 has a net weight of around 502 kilograms,which belongs to medium diameter disc part.Given the structural characteristics and parting surface,a wraparound injection flat pouring and a bottom injection vertical pouring are proposed,and the filling velocity fields of molten metal and defects of the upper turntable body are analyzed and optimized.The results show that the bottom injection vertical pouring could complete the filling process within about 40.39 seconds.However,many defects such as shrinkage porosity were found around a series of holes,which could be improved by riser and cold iron.The filling time was reduced to 29.30 seconds by the quadratic optimization,realizing the transformation from mushy solidification to sequential solidification.The best casing process of the upper turntable body was obtained based on the quadratic optimization.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15