检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董秋彬 DONG Qiubin(Xiamen Synbop Technology Co.,Ltd.,Xiamen 361006,China)
出 处:《中国照明电器》2024年第11期75-77,共3页China Light & Lighting
摘 要:建筑泛光与景观照明施工涉及灯具选择、电气规划、多专业协调及调试测试等多个环节。为进一步明确建筑泛光、景观照明控制系统和施工技术流程,本文以厦门新体育中心机电安装项目为例,分析了项目建筑泛光与景观照明控制系统施工的重点与难点。最后从施工工艺、系统调试运行两方面,阐述该项目具体施工组织方案。系统调试运行结果表明,在连续运行时间(24h×7)内无故障,照度、效果与设计一致,表示本次景观照明控制系统质量标准合格,可投入后期使用。The construction of architectural floodlighting and landscape lighting involves multiple aspects such as lamp selection,electrical planning,multi-disciplinary coordination,and debugging and testing.To further clarify the control system and construction technology process of building flood and landscape lighting,taking the Xiamen New Sports Center electromechanical installation project as an example,this paper analyzes the key and difficult points of the construction of the project's building flood and landscape lighting control system.Finally,from the aspects of construction technology and system debugging and operation,the specific construction organization plan of the project is elaborated.The system debugging and operation results show that there are no faults within the continuous operation time(24 h×7),and the illumination and effect are consistent with the design,indicating that the quality standard of the landscape lighting control system is qualified and can be put into later use.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.198.133