检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吕乐 燕跃豪 孙明浩 赵振山 郭星 李锐 LYU Le;YAN Yuehao;SUN Minghao;ZHAO Zhenshan;Guo Xing;LI Rui(Zhengzhou Power Supply Company State Grid Henan Electric Power Company,Henan Zhengzhou 450006,China)
机构地区:[1]国网河南省电力公司郑州供电公司,河南郑州450006
出 处:《农村电气化》2024年第12期109-111,共3页Rural Electrification
摘 要:文章分析一起10 kV接地造成开关柜过电压跳闸事件,某10 kV馈线线路A相接地,B、C相电压升高,15板(1号电容器)因弧光过电压,母线室内相间绝缘击穿,并迅速发展为三相短路,电弧漂移造成母线室背部挡板和下挡板烧蚀,因开关柜内触头严重发热,导致绝缘件性能劣化,使柜内相间短路快速发生。This paper analyzes an overvoltage tripping event of switchgear caused by 10 kV grounding.Phase A of the 10 kV feeder line is connected to the ground,voltages of phases B and C increased,15 board(capacitor No.1)due to arc overvoltage,indoor insulation breakdown of the bus,and rapidly developed into a three-phase shortcircuit.Arcdrift caused the ablation of the back baffle of bus room and the lower baffle,serious heat in the switch cabinet contacts,resulting in insulation performance deterioration,and interphase short circuit in thr cabinet occurs quickly.
分 类 号:TM763[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.138.60.117