检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王丽嫄 徐仲征 陈江华 陈根华 徐杨 WANG Liyuan;XU Zhongzheng;CHEN Jianghua;CHEN Genhua;XU Yang(Jiangsu Power Transmission and Transformation Co.,Ltd.,Nanjing 210028,China)
出 处:《中国高新科技》2024年第21期85-87,共3页
摘 要:随着江苏苏南经济的飞速发展,能源需求急剧增加。有限的跨江线路已无法满足急剧增长的电能需求,大跨越工程新建难度大,所以通过利用原有输电通道,更换输送容量更大的导线,进而提高电能输送量的方法成为解决能源需求的最优选择之一。基于此,文章以五峰山长江大跨越换线项目为例,从技术层面进行论述,供相关人员参考。With the rapid economic development of Jiangsu Province,energy demand has increased sharply.The limited cross-river lines have been unable to meet the rapidly increasing demand for electric energy,and it is difficult to build a new large-span project.Therefore,the method of using the original transmission channel to replace the conductor with a larger transmission capacity,and then improving the transmission capacity of electric energy has become one of the best choices to solve the energy demand.Based on this,the paper takes the Wufeng Mountain Yangtze River crossing line change project as an example,discusses from the technical level,for the reference of relevant personnel.
分 类 号:TM752[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49