检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张晨曦 ZHANG Chenxi(China Railway Fifth Survey and Design Institute Group Co.Ltd.,Beijing 102600,China)
机构地区:[1]中铁第五勘察设计院集团有限公司,北京102600
出 处:《铁道建筑技术》2024年第12期108-110,145,共4页Railway Construction Technology
摘 要:随着CR200J动力集中型动车组在铁路客运逐步普及,未来CR200J动力集中动车组将逐渐替代普速客车承担其在旅客运输中的任务,亟需对现有客车技术整备所进行一定程度的适应性改造以满足CR200J在日常运用中整备作业需求,为铁路行车安全保驾护航。本文从双流客车技术整备所改扩建工程入手,分析普速客车设施用于整备CR200J动力集中动车组所进行的适应性升级改造,总结客车技术整备所工艺设计经验,并系统介绍CR200J动力集中动车组进行整备时所需关键设备。As the CR200J EMU train sets continue to gain widespread acceptance in railway passenger transportation,it is anticipated that the CR200J EMU train sets will progressively assume the responsibilities of conventional passenger trains in the domain of passenger carriage in the coming era.Presently,there is an imperative requirement for the adaptive enhancement of existing passenger train technical servicing depot,to accommodate the running preparations of the CR200J in the daily operations and to guarantee the integrity of railway operations.In this paper,based on the reconstruction and enlargement project of the Shuangliu Passenger Train Technical Servicing Depot,the adaptive upgrade and renovation of conventional passenger trains facilities for the servicing of the CR200J EMU train sets are analyzed,the process design experience of the passenger train technical servicing depot has been summarized,and the essential apparatus required for the upkeep of the CR200J EMU train sets have been systematically introduced.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49