检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘超楠 LIU Chaonan(Xuzhou Natural Resources and Planning Bureau,Xuzhou 221000,Jiangsu,China)
机构地区:[1]徐州市自然资源和规划局,江苏徐州221000
出 处:《地质装备》2024年第6期16-19,共4页Equipment for Geotechnical Engineering
摘 要:为快速排查生态修复实践中矿产储量疑似盗采问题,以徐州经济技术开发区某石灰矿山生态修复项目为例,采用无人机对生态修复区进行快速扫描,通过核定治理红线、治理境界线、开采区现状标高,与原开采地形进行比较,快速核查出目前已开采量和未开采量,结合现场局部RTK高程复核数据,对当前矿山生态修复情况进行评价,核查未发现盗采滥采问题。研究结果表明,无人机测量结合DEM建模可快速计算出矿山开采量,并为类似需快速响应的生态修复应急事件处理提供技术支撑。In order to quickly identify the problem of suspected illegal mining of mineral reserves in the practice of ecological restoration,the author takes the ecological restoration project of a lime mine in Xuzhou Economic and Technological Development Zone as an example,and uses UAVs to quickly scan the ecological restoration area.By verifying the red line and boundary for governance,the current elevation of mining area,and comparing with the original mining terrain,the current mining output and unexploited quantities are quickly verified.In combination with the local RTK elevation review data on the site,the current ecological restoration of the mine is evaluated,and the problem of illegal mining and excessive mining is not found in the verification.The research results indicate that the combination of drone survey and DEM modeling can quickly calculate the mining volume and provide technical support for the handling of ecological restoration emergency events that require rapid response.
分 类 号:TD178[矿业工程—矿山地质测量]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171