作 者:王明[1] Wang Ming(Xingdong Mine,Jizhong Energy Resources Co.,Ltd.,Xingtai 054000,China)
机构地区:[1]冀中能源股份有限公司邢东矿,河北邢台054000
出 处:《煤炭与化工》2024年第12期35-38,共4页Coal and Chemical Industry
摘 要:邢东矿11218工作面的布置为里宽外窄,为了多回收煤炭资源、减少各种因素影响出煤时间,创新出了一套符合现场实际的新的续架工艺并成功应用。为了让后部刮板输送机能够实现双向运输,在输送机机尾处安装了过渡槽代替普通机尾固定节,同时通过扩帮等新型回收煤柱施工工艺方法,在11218工作面多回收煤炭资源7657 t,增加煤炭收入600余万元,取得了很好的经济效益和社会效益。The layout of No.11218 Face in Xingdong Mine was wide inside and narrow outside.In order to recover more coal resources and reduce the influence of various factors on coal discharge time,a set of new support adding technology in line with the actual situation on site was innovated and successfully applied.In order to realize the two-way transportation of the rear scraper conveyor,the transition groove was installed at the tail of the conveyor to replace the fixed section of the ordinary tail.At the same time,through the construction technology of the new recovery coal pillar such as the expansion of the side,7657 tons of coal resources were recovered in the No.11218 Face,and the coal income was increased by more than 6 million yuan,which had achieved good economic and social benefits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127