检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田明俊 胡玉贵 TIAN Ming-jun;HU Yu-gui(China Energy Engineering Group Guangxi Electric Power Design Institute CO.,LTD.,Nanning 530007,China)
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,南宁530007
出 处:《广西水利水电》2024年第6期53-57,共5页Guangxi Water Resources & Hydropower Engineering
摘 要:介绍了某抽水蓄能电站的工程概况及工程地质情况。论述了该抽水蓄能电站的施工分区、场内交通、工厂设施、营地及管理设施、料源及渣场的布置设计。提出抽水蓄能电站在开展施工总布置规划时应重点关注降低工程投资、保障工程建设进度、节约工程建设用地等问题。An introduction is made on the general information and engineering geological conditions of a pumped storage power station.The authors present the layout design of construction zoning,internal transport,factory facilities,campsite and management facilities,material sources and disposal yards.It is pointed out that the general construction layout planning of pumped storage power stations should focus on reducing project investment,ensuring construction progress,and saving construction land etc.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.250.3