检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:柳吉泽 LIU Ji-ze(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023
出 处:《广西水利水电》2024年第6期97-99,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:防渗墙的混凝土浇筑是流态连续的,采用钢性笼骨架固定应力应变计吊装至埋设高程,不仅需要骨架有足够的强度和刚度,以承受混凝土浇筑过程中的各种力,还要防止仪器在浇筑过程中发生移动和损坏,因此埋设方案要设计周全,各方施工要配合得当,本文结合工程实际介绍了混凝土防渗墙应力应变监测仪器的埋设工艺。The concrete pouring of cutoff wall is continuous in flow state.The stress-strain gauge is fixed with a steel cage frame and lifted to the embedded elevation.The frame not only needs to have sufficient strength and stiffness to withstand various forces during the concrete pouring process,but also to prevent the instrument from moving and being damaged during the pouring process.Therefore,the embedment scheme should be well designed and all parties involved in construction must cooperate properly.Combined with the actual situation of project,an introduction was made on the embedding technique of stress and strain monitoring instruments for the concrete cutoff wall.
关 键 词:防渗墙应力应变监测 应力应变计安装 施工技术 屯六水库
分 类 号:TV543.8[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62