检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁招 张健 张敏 李义 师秀锋 郭鑫义 LIANG Zhao;ZHANG Jian;ZHANG Min;LI Yi;SHI Xiufeng;GUO Xinyi
机构地区:[1]中交路桥建设有限公司,北京市100027 [2]中交路桥华东工程有限公司技术中心,上海市201203
出 处:《城市道桥与防洪》2024年第12期175-178,192,M0016,共6页Urban Roads Bridges & Flood Control
摘 要:浙江温州新建永宁大桥位于飞云江下游入海口段,水域部分地质以淤泥质黏土为主,河床以下30 m为淤泥不良地质。由于深厚淤泥层对主墩超长大直径桩基钢护筒施工带来巨大困难,为克服江水流速快、定位困难、钢护筒稳定性差等问题,通过对超长大直径桩基钢护筒施工测量控制技术进行分析,采用相应测量控制技术,能保证钢护筒精准沉桩。Yongning Bridge newly built in Wenzhou City of Zhejiang Province is located at the estuary in the lower reaches of Feiyun River.The part of the geology of the water area is mainly silt clay,and the geology 30 m below the river bed is poor silt.Due to the great difficulties to the construction of the steel casing for the super-long large-diameter pile foundation of the main pier brought by the deep silt layer,in order to overcome the problems of fast river water velocity,difficult location and poor steel casing stability,the analysis is carried out for the construction measurement and control technology of steel casing for super-long large-diameter pile foundation,and the relevant measurement and control technology is adopted,which can guarantee the precise pile sinking of steel casing.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49