检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何永清 蒋明君 秦光宇[2,3,4] 韩波[2,3,4] HE Yongqing;JIANG Mingjun;QIN Guangyu;HAN Bo(Jiangsu Jurong Pumped Storage Company Limited,Zhenjiang 212400,China;Harbin Electric Machinery Company Limited,Harbin 150040,China;Harbin Institute of Large Electrical Machinery Company Limited,Harbin 150040,China;State Key Laboratory of Hydro-Power Equipment,Harbin 150040,China)
机构地区:[1]江苏句容抽水蓄能有限公司,江苏镇江212400 [2]哈尔滨电机厂有限责任公司,哈尔滨150040 [3]哈尔滨大电机研究所有限公司,哈尔滨150040 [4]水力发电设备全国重点实验室,哈尔滨150040
出 处:《大电机技术》2024年第6期78-84,94,共8页Large Electric Machine and Hydraulic Turbine
基 金:国网新源集团有限公司科技项目资助(SGXYKJ-2022-123)。
摘 要:本文针对某水电站水轮发电机顶罩内通风换热问题,开展了水轮发电机顶罩内通风和温升共轭计算数值研究,分析了顶罩内不同通风结构、风压等对顶罩内冷却换热的影响机理以及顶罩内的气体流通规律和换热机理,提出了改进顶罩内通风冷却效果的结构方案。研究表明:合理的设置顶罩侧面开孔数(减少孔数)和布置防尘罩与集电环间距(增大间距)有利于通风冷却,降低集电环和碳刷温度,保证机组安全运行。This article focuses on the ventilation and heat transfer problem inside the top cover of a hydroelectric power station's hydroelectric generator.A numerical study was conducted on the conjugate calculation of ventilation and temperature rise inside the top cover of the hydroelectric generator.The influence mechanism of different ventilation structures,wind pressure,etc.on the cooling and heat transfer inside the top cover was analyzed,as well as the gas flow law and heat transfer mechanism inside the top cover.A structural scheme to improve the ventilation and cooling effect inside the top cover was proposed.Research has shown that setting a reasonable number of holes on the side of the top cover(reducing the number of holes)and arranging the distance between the dust cover and the collector ring(increasing the distance)are beneficial for ventilation and cooling,reducing the temperature of the collector ring and carbon brush.Ensure the safe operation of the unit.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15