深部高瓦斯强动压巷道切顶卸压机制及技术研究  被引量:1

Study on mechanism and technology of roof cutting and pressure relief in deep roadway with strong dynamic pressure and high gas

在线阅读下载全文

作  者:肖同强[1,2] 任勇辉 神文龙 贾义雪 许磊 刘发义[4] 代晓亮 XIAO Tongqiang;REN Yonghui;SHEN Wenlong;JIA Yixue;XU Lei;LIU Fayi;DAI Xiaoliang(School of Energy Science and Engineering,Henan Polytechnic University,Jiaozuo 454003,China;Collaborative Innovation Center of Coal Work Safety and Clean High Efficiency Utilization,Jiaozuo 454003,China;School of Civil Engineering,Henan Polytechnic University,Jiaozuo 454003,China;Qinshui Hudi Coal Industry Co.,Ltd.,Jinneng Holdings Equipment Manufacturing Group,Jincheng 048200,China)

机构地区:[1]河南理工大学能源科学与工程学院,河南焦作454003 [2]煤炭安全生产与清洁高效利用省部共建协同创新中心,河南焦作454003 [3]河南理工大学土木工程学院,河南焦作454003 [4]晋能控股装备制造集团沁水胡底煤业有限公司,山西晋城048200

出  处:《采矿与岩层控制工程学报》2024年第6期126-140,共15页Journal of Mining and Strata Control Engineering

基  金:国家自然科学基金资助项目(52274077);河南省自然科学基金资助项目(242300421072);深井瓦斯抽采与围岩控制技术国家地方联合工程实验室开放基金资助项目(SJF2213)。

摘  要:深部邻空巷道面临强动压、高瓦斯的双重困扰。为解决深部邻空巷道严重变形问题,以13131巷为工程背景,采用理论分析、数值模拟、现场试验等方法,研究了采空区侧向上覆岩层运动特征、邻空巷道围岩变形机制以及邻空巷道切顶卸压技术参数。结果表明:6.0m粉砂岩是上覆岩层亚关键层,弧形三角块破断导致厚硬岩层共同运动,致使侧向支承压力及其影响范围增大,造成邻空巷道严重变形;切顶卸压效果与切顶高度、切顶角度密切相关,只有当切顶高度达到关键层顶部时,才能有效降低邻空巷道变形量,超过关键层高度后,效果提升不再明显;当切顶角度为0°时,岩块传递的侧向支承压力最小,切顶角度由0°增加至10°时,邻空巷道变形量呈轻微上升趋势,由10°增加至20°时,邻空巷道变形量大幅增大。基于切顶关键技术参数及顶板瓦斯抽放钻孔空间分布特征,提出了“预留超前安全距离+留设抽放钻孔保护距离+封孔长度差异化+瓦斯监测与安全保障”爆破切顶技术方案,并开展了现场试验,有效控制了邻空巷道变形量,保证了顶板钻孔瓦斯抽采效果。Deep gob-side roadways are subjected to the dual challenges of strong dynamic pressure and high gas content.To address the severe deformation of deep gob-side roadways,the 13131 roadway was used as a case study.Theoretical analysis,numerical simulation,and field testing were employed to study the movement characteristics of overlying strata on the gob side,the deformation mechanism of the surrounding rock,and the technical parameters for roof cutting and pressure relief.The results show that 6.0 m siltstone layer acts as a subkey layer within the overlying strata.The fracture of arc-shaped triangular blocks triggers the collective movement of thick and hard strata,resulting in increased overburden load,an expanded influence range of side abutment pressure,and severe deformation of the gob-side roadway.The effectiveness of roof cutting and pressure relief depends heavily on the roof cutting height and angle.Effective reduction of roadway deformation is achieved only when the roof cutting height reaches the top of the key stratum;beyond this height,the improvement becomes negligible.At a roof cutting angle of 0°,the transmitted side abutment pressure is minimal.As the roof cutting angle of from 0°to 10°,the deformation of the gob-side roadway shows a slight increase.However,when the angle increases from 10°to 20°,the deformation increases significantly.Based on the key technical parameters of roof cutting and the spatial distribution of gas drainage boreholes,a blasting roof cutting scheme was proposed.This scheme incorporates an advanced safety distance,a protective distance for drainage boreholes,differentiated sealing lengths,and gas monitoring with safety assurance.Field tests demonstrated that this approach effectively controlled roadway deformation while maintaining gas drainage efficiency in roof boreholes.

关 键 词:深部巷道 围岩控制 覆岩运动 切顶卸压 瓦斯抽采 

分 类 号:TD322[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象