作 者:余国爱 晁海涛 王春懿 王煜城 鲁成红 YU Guoai;CHAO Haitao;WANG Chunyi;WANG Yucheng;LU Chenghong(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2024年第12期47-50,共4页Yunnan Water Power
摘 要:在排水管网改造施工过程,因区域内现状地下管网经过多年的无序自行升级改造,管网系统连通情况极为复杂,或施工区周边的厂房、居民楼等建、构筑物阻碍,困难重重。非开挖顶拉管施工工艺以其能很好地解决传统明挖、顶管、拖拉管等工艺无法施工的难题,仅通过单一工作面就能实现管道的扩孔、拉顶、安装,进一步拓宽了城市排水管网施工工艺的道路。During the construction process of the drainage pipe network renovation,due to the disorderly upgrading and renovation of the existing underground pipe network in the area for many years,the connectivity of the pipe network system is extremely complex.And there are numerous buildings and structures such as factories and residential buildings around the construction area.The nonexcavation pipe-jackingand pulling pipe construction technology can effectively solve the problems that traditional methods such as open excavation,pipejackinge,and drag pipe cannot be used for construction.It can achieve pipe expansion,jacking,and installation through a single working face,further expanding the road for urban drainage pipe network construction technology.
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.23.102.192