检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡佰权 Hu Bai-quan(China Tunnel Construction Group Co.,Ltd.Guangdong,Guangzhou 510000,Guangdong Province,China)
机构地区:[1]广东华隧建设集团股份有限公司,广东广州510000
出 处:《建筑与装饰》2024年第24期121-123,共3页Construction & Decoration
摘 要:随着城市化进程的加快,深埋长距离盾构隧道工程逐渐成为城市基础设施建设的重点。本文结合具体工程,重点对深埋长距离盾构隧道控制测量技术进行探究,主要从工程概况、准备工作、GPS控制网布设、陀螺定向测量、贯通及竣工断面测量等方面进行了详细阐述,旨在为提高盾构隧道施工精度和效率。With the acceleration of urbanization process,deep-buried long-distance shield tunnel engineering has gradually become the focus of urban infrastructure construction.Combined with specific projects,this paper focuses on the exploration of control survey technology of deep-buried long-distance shield tunnel,mainly delves into the engineering overview,preparation,GPS control network layout,gyrostatic orientation survey,holing-through and completion section survey,aiming to improve the construction accuracy and efficiency of shield tunnels.
关 键 词:深埋长距离盾构隧道 控制测量技术 GPS控制网 陀螺定向 贯通测量
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.87