检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李香花 Li Xiang-hua(Guangdong No.1 Construction Engineering Co.,Ltd.,Guangzhou 510000,Guangdong Province,China)
机构地区:[1]广东省第一建筑工程有限公司,广东广州510000
出 处:《建筑与装饰》2024年第24期133-135,共3页Construction & Decoration
摘 要:在复杂地质环境中,桩基施工常面临成孔困难、桩身质量难以保证及施工安全风险增加等问题。为此,本文从地质勘察与评估、施工工艺优化、施工质量控制、施工安全管理及环境保护与治理等多个方面,提出了一系列优化措施。旨在通过这些策略的有效实施,提升复杂地质条件下桩基施工的技术水平,确保工程质量与施工安全,推动基础设施建设的高质量发展。In the complex geological environment,pile foundation construction often faces problems such as difficulty in hole formation,difficulty in ensuring pile quality and increased construction safety risk.To this end,this paper proposes a series of optimization measures in the aspects of geological investigation and evaluation,construction technology optimization,construction quality control,construction safety management,and environmental protection and governance.Through the effective implementation of these strategies,it aims to improve the technical level of pile foundation construction under complex geological conditions,ensure project quality and construction safety,and promote the high-quality development of infrastructure construction.
关 键 词:复杂地质条件 桩基施工 技术优化 质量控制 安全管理 环境保护
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15