岸桥拖链电缆安装技术研究  

Research on Installation Technology of Drag Chain Cable for Shore Crane

在线阅读下载全文

作  者:龙浩 Long Hao(Shanghai Zhenhua Heavy Industry(Group)Co.,Ltd.Changxing Branch,Shanghai 201913)

机构地区:[1]上海振华重工(集团)股份有限公司长兴分公司,上海201913

出  处:《设备监理》2024年第6期55-58,共4页Plant Engineering Consultants

摘  要:岸边集装箱起重机(简称岸桥)拖链电缆的安装环节较为烦琐,导致最终难以达到预期的安装效果。为避免发生电缆损坏,排除安装隐患,提出对岸桥拖链电缆安装技术进行研究。本文简述拖链电缆供电系统原理,分别从部装阶段拖链电缆安装技术、总装后拖链电缆安装技术两个方面进行论述,对安装注意事项进行说明分析,简化安装难度,为起重机拖链电缆安装技术提供参考。The installation process of drag chain cables for shore container cranes is relatively complicated,which makes it difficult to achieve the expected installation effect.In order to avoid cable damage and eliminate installation hazards,a research on the installation technology of drag chain cables for shore crane is proposed.The article briefly describes the principle of the power supply system for drag chain cables,discussing the installation technology of drag chain cables in the partial assembly stage and the installation technology of drag chain cables after final assembly.It explains and analyzes the installation precautions,simplifies the installation difficulty,and provides reference for the installation technology of crane drag chain cables.

关 键 词:岸桥 拖链电缆 电缆安装 电缆固定 

分 类 号:TB497[一般工业技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象