检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Ziyang ZHOU Fukang GUO Jianzhong NI Kun FENG Jingxuan ZHANG Yiwen LIU
机构地区:[1]Key Laboratory of Transportation Tunnel Engineering of Ministry of Education,Southwest Jiaotong University,Chengdu 610031,China [2]Hangzhou Fuyang City Construction Investment Group co.,Ltd.,Hangzhou 310000,China
出 处:《Frontiers of Structural and Civil Engineering》2024年第11期1663-1679,共17页结构与土木工程前沿(英文版)
基 金:National Key R&D Program of China(No.2021YFB2600900);National Natural Science Foundation of China(Grant No.52078430).
摘 要:This paper presents a calculation method that evaluates the extent of disturbance based on structural safety limits.Additionally,it summarizes the assessment methods for construction disturbance zones in shield tunneling near pile foundations,urban ground structures,and underground structures.Furthermore,taking the construction of the Chengdu Jinxiu Tunnel under bridges and urban pipelines as the engineering background,a study on the disturbance zoning of adjacent structures was conducted.The most intense disturbance occurs within one week of the tunnel underpass process,and it has a significant impact within a range of two times the tunnel diameter along the tunnel axis.The bridge pile and bridge deck experience less disturbance from tunnel approaching construction,with a maximum disturbance zone characterized as medium disturbance.On the other hand,underground pipelines are subjected to more significant disturbances from tunnel construction,with a maximum disturbance zone classified as strong disturbance.The implementation of“bridge pile sleeve valve pipe grouting&underground pipeline ground grouting&tunnel advance grouting”in the field effectively limits the vertical settlement of bridges and pipelines,resulting in a decrease of approximately 0.1 in disturbance level for the structures.The disturbance zoning method can assess tunnel disturbance with structures,identify high-risk interference locations,and facilitate targeted design reinforcement solutions.
关 键 词:shield tunnel approaching construction field monitoring disturbance zoning method
分 类 号:U455[建筑科学—桥梁与隧道工程] U231.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49