检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Wanxiao Jiang Jichun Liu Jawad Shafqat Yi Lei
机构地区:[1]College of Electrical Engineering,Sichuan University,Chengdu 610065,China
出 处:《CSEE Journal of Power and Energy Systems》2024年第6期2597-2609,共13页中国电机工程学会电力与能源系统学报(英文)
摘 要:With the rapid growth of photovoltaic integration,the volatility and uncertainty of intermittent photovoltaic injection will dramatically reduce system operation reliability from the generation side.The system operator may face certain financial risks brought by unexpected power failure under low operation reliability.Therefore,maintaining sufficient power reserve to meet system operation reliability and reduce risk,especially in an isolated system,is essential.However,the traditional reserve preparation strategy fails to consider the uncertainties of the power generation under the high penetration levels of emerging renewable energy resources.A novel reserve preparation strategy for an isolated system is developed in this paper using a twostage model.In the first stage,the optimal hourly scheduling of an isolated system is determined.In the second stage,a minute level conditional value-at-risk(CVaR)based model is established where the uncertainty of the reserve requirement is introduced with the chance constraint.The proposed discretized step transformation(DST)and subtraction type convolution(STC)methods are utilized to convert the model into mixedinteger linear programming,and finally solved by applying the CPLEX solver.The IEEE 39-bus system is used as the test case to validate the feasibility and effectiveness of the proposed two-stage model.
关 键 词:Isolated multi-energy complementary generation system renewable energy RESERVE risk assessment
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.83.94