检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李杰三 LI Jiesan(Zhumadian Banqiao Reservoir Operation Center,Zhumadian 463000,China)
机构地区:[1]驻马店市板桥水库运行中心,河南驻马店463000
出 处:《河南水利与南水北调》2024年第11期52-53,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:某水库位于县城西郊胡家庄村的淮河干流上、县城西北2 km处,控制流域面积64.20 km^(2),坝址区以上河道长度22.10 km,多年平均径流量2 589万m^(3)。水库工程任务以防洪为主,结合灌溉、供水等综合利用。文章对上坝址和下坝址在地形地貌、地层岩性、构造、覆盖层厚度、风化带厚度、透水带深度、岩体质量等进行对比分析,上、下两个坝址的基本工程条件相似,各有优劣,均具备建坝条件,上坝址在地形方面及搬迁人口方面优于下坝址。The planned reservoir is located on the main stream of the Huaihe River in Hujiazhuang Village,2 km to the northwest of the county seat,with a control area of 64.20 km^(2).The river length above the dam site is 22.10 km,and the average annual runoff is 25.89 million m^(3).The construction of the reservoir project is mainly for flood control,combined with irrigation and water supply.This paper compares and analyzes the topography,stratum lithology,geological structure,overburden thickness,weathering zone thickness,permeable zone depth,rock mass quality and so on of the upper dam site and lower dam site.The basic engineering conditions of both sites are similarly,and are suitable for dam construction.Considering the topography and relocation of residents,the upper site is better than the lower site.
分 类 号:TV221.2[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.134.253.192