检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫石 钟素梅 YAN Shi;ZHONG Sumei(Shenzhen Airport(Group)Co.,Ltd.,Shenzhen 518128;Shenzhen Metro Operation Group Co.,Ltd.,Shenzhen 518040)
机构地区:[1]深圳市机场(集团)有限公司,深圳518128 [2]深圳地铁运营集团有限公司,深圳518040
出 处:《黑龙江电力》2024年第5期431-437,共7页Heilongjiang Electric Power
摘 要:针对某35 kV小电阻接地供电系统发生的两起35 kV母线发展性短路故障中继电保护均正确动作,最终35 kV开关柜烧毁的情况进行分析,并提出改进措施。通过调取故障录波,采用对称分量法结合一次设备检查,对故障过程、保护动作进行分析,并应用电磁暂态仿真软件PSCAD/EMTDC对故障波形进行仿真验证。继电保护配置、整定不合理是主要原因,并提出改进建议。According to two developing short circuit faults of busbar in a 35 kV power system by low resistance grounding,which is correct operation of relay protection but 35 kV C-GIS are damaged,analysis cause and improvement suggestions are proposed.Combined with fault recording and inspection,fault processes and protection operations are analyzed by symmetrical component method,simulated and verified by PSCAD/EMTDC.The unreasonable configuration and setting of relay protection are main cause and the improvements are proposed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.224.139