作 者:李伟 姜卫平 LI Wei;JIANG Wei-ping(China Sinogy Electric Engineering Co.,Ltd.,Handan 056002,China;China Huadian Engineering Co.,Ltd.,Beijing 100070,China)
机构地区:[1]中机国能电力工程有限公司,河北邯郸056002 [2]华电科工股份有限公司,北京100070
出 处:《硫磷设计与粉体工程》2024年第5期9-12,26,I0001,共6页Sulphur Phosphorus & Bulk Materials Handling Related Engineering
摘 要:以印尼TJB 2×1000 MW电厂输煤系统设计为例,介绍了该输煤系统的设计方案,从设计范围、安全措施、设备布置等方面分析海外电厂与国内电厂输煤系统设计存在的差异,分析了项目设计存在的主要问题,并给出改进建议,供同行设计类似项目时参考。Taking the design of the coal conveying system of the TJB 2×1000 MW power plant in Indonesia as an example,the design scheme of the coal conveying system is presented,the differences between the design of the coal conveying system of overseas power plants and domestic power plants are analyzed from the perspectives of design scope,safety measures and equipment layout,the main problems existing in the project design are analyzed,and the improvement suggestions are given for the reference of peers when designing similar projects.
关 键 词:海外大型火电厂 输煤系统 设计差异 存在问题 改进建议
分 类 号:TB498[一般工业技术] TQ536.1[化学工程—煤化学工程]