检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李鹏博 招滨 张学东 LI Pengbo;ZHAO Bin;ZHANG Xuedong(China Energy Engineering Group Guangxi Electric Power Design Institute Co.Ltd.,Nanning 53007 China)
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007
出 处:《红水河》2024年第6期36-40,共5页
摘 要:基于大型水利枢纽船闸金属结构布置方案,闸门(阀门)及启闭设备布置选型,笔者从技术、运行和投资等方面,对上闸首闸门挡洪方案和上、下闸首检修闸门启闭及存储方案进行比选;介绍闸门(阀门)启闭系统、船闸浮式系船柱、防撞警戒装置的选用和布置。Based on the layout scheme of metal structure of shiplocks in large hydro project the layout and selection of gate valve and hoisting equipment the authors compare and select the flood retaining scheme of upper lock head gate and the opening and closing and storage scheme of upper and lower lock head maintenance gate from the aspects of technology operation and investment.The selection and arrangement of gate valve hoisting system floating mooring column of shiplocks and anti-collision warning device are introduced.
分 类 号:TV664[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.65.73