通古孜布隆水库大坝温控仿真计算研究  

Temperature Control Simulation Calculation of Tongguzibulong Reservoir Dam

在线阅读下载全文

作  者:马永磊 江晨芳 MA Yonglei;JIANG Chenfang(Xinjiang Water Conservancy and Hydropower Survey Design Institute Co.Ltd.,Urumqi 830099 China;China Institute of Water Resources and Hydropower Research,Beijing 100083 China)

机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐830099 [2]中国水利水电科学研究院,北京100083

出  处:《红水河》2024年第6期41-46,共6页

摘  要:通古孜布隆水库大坝温控的重点是高温时节混凝土浇筑温度控制和冬季保温问题,参考相关工程经验,提出夏季采用通水冷却、冬季采用聚氨酯作为保温层的混凝土浇筑温控措施。为评价温控措施的可行性,以4号非溢流坝段为例,通过利用三维有限元软件进行混凝土浇筑温控仿真模拟计算分析。结果表明:施工期与运行期的温控措施有效,通水冷却可以降低温度3℃~6℃;施工期和运行期的最大温度应力均不超过混凝土允许应力,满足规范要求。The focus of temperature control of Tongguzibulong Reservoir dam is the temperature control of concrete pouring in high temperature season and heat preservation in winter.Referring to relevant engineering experience the temperature control measures of concrete pouring with water cooling in summer and polyurethane as insulation layer in winter are put forward.In order to evaluate the feasibility of temperature control measures taking No.4 non-overflow dam section as an example the simulation calculation and analysis of concrete pouring temperature control are carried out by using three-dimensional finite element software.The results show that the temperature control measures during the construction period and the operation period are effective and the water cooling can reduce the temperature by 3℃~6℃The maximum temperature stress during the construction period and the operation period does not exceed the allowable stress of concrete which meets the requirements of the specification.

关 键 词:温度场 温控措施 三维有限元分析 仿真计算 通古孜布隆水库 

分 类 号:TV544[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象