检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡喆 HU Zhe(Power China Kunming Engineering Corporation Limted,Kunming,Yunnan Province,650051 China)
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051
出 处:《大众科学》2024年第9期16-18,共3页China Public Science
摘 要:直流电源系统为水电站重要设备的操作控制和保护提供可靠的供电保障,在事故造成全厂停电时还作为临时应急电源,保障重要设备仍可正常运行,为电站提供宝贵的应急恢复时间.从相关规程规定的要求出发,结合抽水蓄能电站枢纽布置和用电负荷需求的特点,提出了针对抽水蓄能电站的直流电源系统的优化配置方案.DC power supply system provides reliable power supply for the operation control and protection of important equipment in the hydropower station,and in the event of a station outage caused by an accident,they also serve as temporary emergency power supplies to ensure that important equipment can still operate normally,so as to provide valuable emergency recovery time for the power station.Starting from the requirements of relevant regulations,and combined with the characteristics of hub layout and electricity load demand of pumped storage power stations,this article proposes an optimum configuration plan for the DC power system in pumped storage power stations.
关 键 词:抽水蓄能电站 直流电源系统 优化配置 机电设备布置
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49