检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭玉冉 赵建富 GUO Yuran;ZHAO Jianfu(Qingdao TGOOD Design Institute Co.,Ltd.,Qingdao,Shandong Province,266100 China)
机构地区:[1]青岛特锐德设计院有限公司,山东青岛266100
出 处:《大众科学》2024年第10期23-25,共3页China Public Science
摘 要:在城市化建设与发展的过程中,电力资源的需求量持续增大,人们对电力资源的安全、稳定性要求也不断提升.作为电力资源输送安全保障的变电站,土建结构设计的科学性与其投运后能否安全运行关系密切.基于此,分析了变电站土建结构设计中存在的选址不科学、地基结构稳定性欠佳、站内布局不合理、框架梁柱设计不科学四方面问题,并以问题为导向提出了针对性的处理方案,旨在为变电站建设单位科学设计土建结构提供参考.In the construction and development process of urbanization,demand for electric power resources continues to increase,and requirements for the safety and stability of electric power resources also continue to increase.A substation is a safety guarantee of the transmission of power resources,and the scientificity of the design of its civil structures is closely related to its safe operation after it is put into operation.Based on this,the paper analyzes four problems existing in the design of the civil structure of substations:unscientific site selection,the poor stability of foundation structures,unreasonable substation layout and the unscientific design of frame beam columns,and puts forward problem-oriented targeted treatment schemes,aiming at providing reference for substation construction units to scientifically design civil structures.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7