检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈梦婷 CHEN Mengting(The 1st Engineering Co.,Ltd.of China Railway 12th Bureau Group,Xi'an,Shaanxi Province,710038 China)
机构地区:[1]中铁十二局集团第一工程有限公司,陕西西安710038
出 处:《大众科学》2024年第18期67-69,共3页China Public Science
摘 要:老旧小区改造对提升居民生活质量和城市发展至关重要.屋面防水层的修缮升级是其核心环节,解决防水材料老化、施工工艺滞后、维护管理不足等问题尤为重要.施工过程需重视基面处理、分区施工和多层防水结构设计.具体技术改进包括防水卷材施工的热熔法铺设与搭接处理、防水涂料施工的分层涂刷与加强部位处理以及排水系统的改进.最后,施工后的质量控制通过自检互检、专业检测及维护保养确保防水工程的长期有效.The renovation of old residential areas is crucial for improving the quality of life of residents and urban development.The repair and upgrading of the roof waterproof layer is the core link,and it is particularly important to solve problems such as aging of waterproof materials,lagging construction technology,and insufficient maintenance and management.Optimizing the construction process includes detailed investigation,scientific scheme formulation,and meticulous material preparation.The construction process needs to pay attention to the treatment of the foundation,zoning construction,and the design of multi-layer waterproof structures.The specific technical improvements include the hot melt laying and overlapping treatment of waterproofing membrane construction,the layered brushing and reinforcement treatment of waterproofing coating construction,and the improvement of drainage system.Finally,quality control after construction ensures the long-term effectiveness of waterproofing projects through self inspection and mutual inspection,professional testing,and maintenance.
分 类 号:TU761[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.35.63