检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘伟庆 赵晖 LIU Weiqing;ZHAO Hui(Power China Sepco1 Electric Power Construction Co.,Ltd.,Jinan,Shandong Province,250001 China)
机构地区:[1]中国电建集团山东电力建设第一工程有限公司,山东济南250001
出 处:《大众科学》2024年第20期49-51,共3页China Public Science
摘 要:近年来,随着我国电网规模的不断扩大,其自身的复杂程度也在不断加大。110 kV综合自动化变电站具有良好的可靠性、适应性以及灵活性,目前已成为较为常见的变电站之一,受到社会各界的广泛关注,对其展开科学的电气二次设计,有助于提高110 kV综合自动化变电站的整体性与综合性,确保稳定供应。结合实际案例,通过计算得出主变参数指标,以此实现了电气二次设计的主体部分。In recent years,with the continuous expansion of the power grid scale,its own complexity has also been increasing.110 kV comprehensive automation substations have good reliability,adaptability,and flexibility,and have become one of the more common substations,receiving widespread attention from all sectors of society.Scientific electrical secondary design for them can help improve the overall integrity and comprehensiveness of 110 kV comprehensive automation substations,ensuring stable supply.This article combines practical cases and calculates the main transformer parameter indicators to achieve the main part of electrical secondary design,and summarizes the precautions.
关 键 词:110 KV 电气二次设计 综合自动化变电站 参数计算
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49